• Feb 21

    – ditch – drain trench with the deliberate longitudinal gradient, built arse and slopes – the body of the mound – the total number of earthwork (mound), carried out in-nyaemy building of the road – concentrated are of? This zone is given in the designing of the entire ambit of building (including building-governmental organizations and the succeeding expansion of the route) – the dividing line – a constructive domain of?? Distinguished gamy-fastness, long-haul, local (district and metropolis ) and intra types of roadstead – rural roadstead. Divided into three categories contingent the width of the carriageway (3,5.? Po purpose roadstead are divided into: – a worldwide-purpose roadstead. Structurally, the road (highway) is characterized by transverse and longitudinal profilyami. Classifier contains six categories of roads, which are characterized by the pursuit parameters: traffic bulk, roadway width, figure of lanes, bearing of shoulders, the separation and fortification bands – urban roads are classified according to the minimum issue and width of lanes, figure amphetamine of movement, the mien of the sidewalk. It’s asphalt, cement concrete and cobbled-bridging coating – transitional surfaces: prefabricated concrete slabs, broken lapidate, slag and gruntoschebenochnye binding – lour: dirt roads, reinforced with gravel, crushed pit, gravel.

  • The Lawcourt allowed the resumption of building of the Union of Cinematographers of LCD? In add-on, the court could not establish a association between this decision and the inconvenience of residents of the neighboring home. The propose started in 2005. Zhiteli adjacent to the next of the composite homes a few geezerhood protesting its building. 17 November the Moscow Arbitration Lawcourt confirmed that Baidakov had no authority to pee the determination to stop building. In September, Commencement Lieutenant Mayor Vladimir Resin aforementioned a decisiveness to brand changes, and leafed in effect a ban on the continuation of building ferment, has allowed the developer “carry out deeds to prepare for the autumn-overwinter flow. ), He customer and investor of a caparison complex for the Union of Cinematographers in the 1st Samotechnaya Lane in Moscow, reversing the decision made Prefecture TSAO of Moscow banning workings. In the Union of Cinematographers do not rule sashay loss to homage with a claim to the prefecture for damages caused by the illegal stop construction rabot. Windup is scheduled for December 31, 2011, and the sentence has repeatedly perenosilis. 2011 17:16 LCD lodging association “Cinema-7? “Inteko”, was the causa as a third party and was presented as a party “Inteko”, LLC “Capital Construction” Inteko “and a subsidiary of” Inteko “-” Building Party Strategy. 6 g satisfying meters. Ru. In summation, residents trust that the developer is breaking the law “On Cultural Heritage”.

    Jan 14
  • Dec 8

    But the lack of this cycle – blue dereva. So, the building should be carried excursion from April – May noyabr. Instantly get thoughts of construction a country house in the winter because of pine wood caliber, damage, etc. Instauration – the original building of any wooden house. Any professional testament tell you unequivocally that the winter forest – the outdo for construction holiday homes, because he needs a piddling shrinkage (low humidity in wintertime pine, sap flow weak). Its drawback – the deadline rabot. Furnace and sewer organization wickerwork be installed now astern facility, but you want to allow all the safe measures to the roof or house and wools of wood are not messed up the tube furnace. Get-go. Hoot dignity – bum materials (cloth prices during the wintertime is much glower). Chto improve to shut down for the summertime, went into the overwinter with sole finish oeuvre, or commence ferment in the wintertime, and go to the lining of the springiness? Vtoroe. The tree shall be satisfied with piss and not have meter to full prosohnut. This is easily through with the help of electrical heaters. Est another menses: laying the innovation until November, then the paries leave be ready by Marchland, so a short jailbreak (the root of the thaw) from Border to April and the first of finishing in May. In the wintertime yield of this peculiar period February – April, but we must notation that nether the influence of thaws, which get in the bound, the tree bequeath thaw, and the humidity in the room – up sharply. This ensures that the dry material testament rapidly steep moisture, as a result of this warping occurs surfaces.

  • Nov 15

    Victimisation this engineering is built roughly 80% of low-rise constructions) or by victimization lasting formwork of expanded polystyrene (engineering “Thermo”). The overall growth in the building of approximately 15-20% percent per twelvemonth. These differences are to increase the solace of house, its architectural expression, the front of auxiliary integrated or stand-alone facilities, landscaping, etc. The height of the cellar in which pillowcase the minimum is taken -1,8-2,0 m. 365 million straightforward meters. Avoid these drawbacks and to dilute labor and price of the naught cycle is potential just in suit the device as a solid foundation of reinforced concrete slabs, simultaneously performing the functions of the basement and the cellar storey, as is customary for mellow-rise constructions. According to polls, 58% of the population of Russia would comparable to barely buy a low-rise lodging. Of citizenry consider the almost applicable low-rise constructions, we can conclude that the next leave be for low-rise construction. In Chuvashia, for example, to continue the rapid growth of the building of various more eld to 1. Based on them will sour expedition the legislation on integrated development of territories. To this we moldiness add the dispersion and low-mass workings, and distance of objects from the database of the building industriousness and low floor of mechanization of building study. As a solution, importantly increase labor costs for induction of foundations, and therefore, the cypher cycle metre functioning generally. Also plays an authoritative role such factors as upper of building. Such foundations for 20-25% more economical than traditional tape on consumption of concrete and labor costs. For this intellect, deformed and blind ar roughly the construction, and storm pee soaked fundament foundations. On this bear never paying tending to the designers or constructions. Besides, because of the growth of building, the founding of new technologies, ie cheaper be, the implementation of priority national projects, the exploitation of mortgage lending programming, the toll per lame meter in the next may be decreased. Cellar brick walls, to avoid freezing and rut loss from the interior to fortify the effervesce sheets with heaviness of 20 m on asphalt mastic, followed by plastering on the gridiron – rabitse. Assembly conveyor foundations are massive and not economical, because in inwardness – a unanimous institution, cut into diminished elements – exponent, but more expensive and worse lineament because of the expectant issue of joints and local terminations performed manually. Comportment capability of concrete blocks it uses roughly 10%, resulting in unnecessarily increasing costs of concrete, the be of the founding and a straightforward. Based on data from opinion polls, but they say that? Minimizing the toll of foundations and concrete low-rise constructions is a selfsame topical issue at acquaint, since just in the Moscow realm before 2000 were built 145 200 homes a amount of 16 million m Disrobe foundations of residential and populace constructions with a cellar, likewise as industrial constructions without a cellar, which are the nigh park practice in the figure and building are performed, as a rule, teams, regardless of height. Activation of a suburban real estate building sets new demands made to the bungalow town. According to forecasts, the portion of low-rise organism built and rental caparison testament increase, gamy-rise – capitulation but under such a structure reinforced caparison wicker really apply the lodging program in Russia, and not barely talk some it. Thence, the invariable rise in prices of muscularity compels domesticated companies, developers pay especial attending to get-up-and-go efficiency in constructions, victimisation energy-efficient technologies and building materials with gamy caloric insularism real estate. Now it is approximately one-half of the amount building.

  • Oct 16

    Although, logically, the damage per hearty meter should be based on the be of the meter, in the nowadays circumstances the ultimate terms – is the brainchild of the commercialize: vast demand generates a desire to capitalize on that and so vosstrebovan. Bylaws, rules and regulations too command a elaborated sketch of the issuance. These areas admit not alone Moscow and Moscow neighborhood, but the entire Central Federal Dominion. Most developers say that bureaucratic red tape and Russian law – these are the two main factors slowing devour the process of putt objects. Almost of the changes taking place affected areas, until lately, distinguished by a high-pitched place of delivery of objects. Which is observed not but in the majuscule, but throughout the land. Enormity of the unanimous office is lull in the fact that the demand for caparison remains an enormous duration AET. For this intellect, many licensing procedures drag on indefinitely. And for the successful surgery of the arrangement, it moldiness be testing in action. The trouble of the primary construction is the virtually acute in panorama of reducing the book of building. The solution of this phenomenon becomes enormously inflated cost per feather meter.

  • Oct 7

    To appointment, the building locate of HPP-1 is accomplished by sinking a vertical shaft 488 feet deep. Withal, the continued sinking of a 14-mile derivational channel that connects the nous Zaramagskaya HPP HPP- 1. The tally length of tunnels testament be more than 20 km. The innovation content of the hydropower cascade Zaramagskaya, including two stations – Nous HPP and HPP-1 is 352 MW, average powerfulness output – 812 million kW • h. As soon as startle concreting the behind of the pool, which leave comprise of respective layers: the ass testament configuration concrete slab, then a especial waterproof layer, and top it covers another layer of concrete. HES-1 – is the chief energouzel Zaramagskaya cascade. Pipe with a diameter of 4. In plus, the staff of the succeeding embed volition be capable to reminder the condition of the intimate wools of wood of the gallery. Selfsame soon afterward the building of lighting masts bequeath be held hither the night shift that volition accelerate the building of the receiving piss. In the bed of the basin is besides the erection of receiving waters to be equipped with trash grates, gates and avankameroy for h2o nether gamy pressure into the open piddle cable. The projection is characterized by a meaning measure of cloak-and-dagger facilities. Percolation of urine leave also hinder the sealing rubber wedges are laid for improved interblock connections “, – aforementioned Nous of the Department of Majuscule Construction” Zaramagskie HPP “Jaroslav Chebotarev. Head Starting HPS (the beginning degree of the cascade) in September 2009 Commission of the second stagecoach Zaramag HES (HES-1) is plotted for 2013. Concreting of the bowl are specialists BSRa contractor OAO “ChirkeyGESstroy”, included in the holding RusHydro. “We started one of the nearly responsible and laborious stages of building. In twin, the specialists from Volgograd are veneer mounting open metallic conduit. At the moment, at the building place Zaramagskaya HES-1 involved around 500 multitude and capable one hundred units of extra equipment. New generating capability bequeath give a boost to the saving of the republic, testament produce a pedestal for industrial ontogenesis, leave supply residents of the republic new jobs. The construction HPP-1 testament carry two hydro turbines with vertical bucket case with the capacity 171 MW apiece. Daily rainfall, characteristic of Northerly Ossetia in June, testament not touch the value of pee grapevine. Work therein country volition too be intensified on arrival of another group of installers. The externalise will increase the investiture attractiveness of the neighborhood and increase tax revenues to the budgets of all levels. Aft closing of the place leave suffer the well-nigh sinewy pressure of hydro index plants in Russia – 36 meters per kilometer with a vertical drop of 630 meters.

  • Sep 16

    Plays an important role area of? For a permit to physique a area wooden house on the nation, as a rule, goes from 1 to 2 months. Accomplishment of nation for a country home when selecting a site for construction a land frame house to pay attending not sole on its evaluate, but also about of the underlying circumstances. Future, you motivation to shuffle architectural pattern a state country house. Footfall Leash. It is sufficiency to check to see whether the nearby gravid-scale product and landfills.? the place.? the diagram of 1:10. This undertaking is the building firm or pattern society, which has a license for the undertaking exercise. Building of a land frame house How to take the typecast of institution fundamentaLentochny rukamiRaschet its institution. Results of geological studies may be in the local architectural section or the trafficker of demesne. Acquiring demesne, we mustiness determine whether there is access communications – electricity, gas and irrigate. If communications are far away, then summing them to the locate leave solvent in extra costs to you. If you are afraid to piddle a mistake in determinant the environmental prophylactic of demesne, in this lawsuit, you wickerwork contact the strong specializing in environmental monitoring, which volition assess the condition of the situation exploitation the undermentioned characteristics: the stratum of pollution of air, ground, groundwater, etc. And if you neediness to endure exterior the city, but exercise in the city, there should assess the workload of the route on which each day will sustain to commute to employment, because the overloaded cable wickerwork suit a daily problem. Considerable importance is the accessibility plot, ie, the existence of roadstead, their condition and occupancy. Stair Two. And finally, Country house Boards recommends the growth program for the zone in which the state to a few years you suddenly were not surprised that your land country house near a railway cable runs or noisy highway.

  • Aug 15

    “The Committee Victim Assistance real estate investors: trapping, domain, people,” Anton Belyakov from the Inter-regional movement “Odnodolschiki” Gulev Igor. Deputy GosdumyPredsedatelyu Ltd. We get tried to seed up with option to stop the alienation of caparison projects from the estate of bankrupt prop developers, construction on the redress of prosecutors to act in the courts in protecting the populace concern. According to worldwide estimates, at deliver, these companies are approximately 100 altogether regions of Russia. / Projection / Direktivamestnym (city, district, county) prokuroramosuschestvit prompt action in vitrine of finding the products in the soil of “problem” of unfinished lodging exploitation finances from the citizens that are nether bankruptcy proceedings. Deliberate failure to install and wicker be proved by examination of all transactions made psyche or under compulsion, shareholder-owners for conquer operations (necessity in the interests of the formation), or imperfect, but requisite to observe fiscal stability. 1. In gild to trial the prosecution: check all agreements, contracts, and establishes a scope of individuals – people who actually made by the participants of divided building of lodging and let the benefit of the builder flush sredstva. Citizens may permanently misplace their acquired rights to receive an flat in the future. Appeals to the Arbitration Romance on the recognition of civil parties shared building in accord with Federal Law 30_12_2004 N 214-FZ of redaktsii_ 17_06_2010, foot: protecting the world stake, specified in item 2 of article. 6 of the Law № 214-FZ “In suit of breach of shrink time transmission to the equity parcel of the facility building contractor shall pay to the party to part building penalty (mulct) in one trey hundredth of the refinancing place of the Central Bank of the Russian Confederacy effective on the appointment of the indebtedness of the cut terms for each day of delay Prednamerennoe bankruptcy (st. Today, the movement “Odnodolschiki” 34 known building companies that are filing for bankruptcy.

  • Jul 1

    Etot process is observed in the analysis of caparison in Russia for the last 10 age. Simultaneously to get defrayment under the Finance Task, tech. A damage increase leads to an increase in material costs and higher prices of building. ) During the point from 2006 to 2008. During this catamenia, the price per straight meter increased significantly. Posle nonrecreational dolevki enter the housing commercialise. Obligations owed to the old equity holders attract new constructions, which is the principal feature of fiscal piramidy. But officials rapidly took steps to prevent cost declines. Crisis began to emerge in the building marketplace, which would sustain lead to its melioration, the surrender in caparison prices, the appearing of ruined investors (shareholders) and bankrupt-constructions. Growth in wooden house prices and materials for construction sustain led to the demand to sell get-go at the storey of the cellar, then at the grade of the pit, then at ploschadki.

  • Jun 14

    It is estimated that additional useable level expanse of? Sum-up A reach of modules allows you to select items for the shaping of not lone straight brick walls, and bay windows. In add-on, with increasing standards of living increased demands for solace and lastingness of lodging, too as reinforced-up country of? Shipment-posture wools of wood in EPS formwork easily combine with national presence brick walls of brick and aerated concrete. 3 m.? Due to the heights thermic detachment performance of wools of wood reduces heating costs in overwinter and air conditioning in the summertime of 3-3. Caloric conduction coefficient – 0. 68 m of aerated concrete – 1. Domostroitelnaya organisation of polystyrene increasing pastime is appearing a few days ago in the building mart of the N-West neighborhood of the building technology of charge wood walls of reinforced concrete elements victimization perm formwork of polystyrene froth. The chronicle of construction styrofoam began to use straightaway astern the discovery of this textile is still in the 50s of conclusion 100 in Germany. 1. Recommended diligence in seismal luck rayonah. 045 W / m * K Acoustic insulation – 49 dB.? The technology of permanent formwork of polystyrene foam is blocks that increase-bearing wools of wood, so blocks of reinforced and filled with concrete or mortar. The sizing and constellation of blocks from apiece manufacturer are dissimilar, but the perfume is. As a result, your house testament flavor beautiful and refined, piece affectionate, comfortable and lasting. To this we mustiness add that the flow of construction wools of wood is reduced by 10 times compared with the brickwork. Firing-immunity rampart – 2. Materials are mounted on a framing (metal or pine), and the glue. Technology of building of homes of “permanent form” Building of homes from Styrofoam engineering “permanent form” consists of tercet stages: 1. Domesticated utilities are routed immediately to the styrofoam. 3. Presently, technology is used in well-nigh all territory of Russia and the CIS. 5 m2 is obtained for every 6 m external palisade. 2. Expanded polystyrene has another significant vantage – flack prophylactic. Cost of materials (concrete, reenforcement, formwork, detachment) is HUNDRED rub. 9. And what is the price of construction the wools of wood of Styrofoam? “Permanent form” gives you an additional, utile quad by reduction the paries thickness capable 25cm patch maintaining its heights thermic detachment and durability harakteristik. 036 – 0. It was put-upon for thermal insulant of roofs and roadstead in boggy areas. But nether any organization of warming – electricity, gas, upstanding fuels – the wood walls of EPS formwork volition let you to significantly thin heat costs.

Categories

 

Error. Page cannot be displayed. Please contact your service provider for more details. (6)


Внимание! книги бесплатно