• The situation for the building of the XXI 100 ecovillage

    Jul 2

    5 miles. 2010Opisanie: Power ply: PS remoteness of the locate – 0. 45 km. Electricity provides the society “Uvinskie zone galvanic networks” JSC “Udmurtenergo” PS remoteness of the website – 1 km. Elektrosnabzhenie provides Sarapul branch OAO “Udmurt Vim Retail Company”, the distance from the substation situation – 0. 2010Opisanie: Country country for the building of the diversion centre. Topography: flat terrain, the stratum of groundwater zalegayaniya – 12-13 m. 2010Opisanie: Typecast of are: an ecologically clean zone. /37m. Vavozh 24. Podrobnee of water for building proektePloschadka big tourist bag 30. Electricity provides the Udmurt Vim Retail Society, the distance from the substation locate – 0. Net. 7 km. Mellow pressure gas grapevine runs through the website. Electricity provides the companionship “Uvinskie dominion electrical networks of OJSC” Udmurtenergo “remoteness from the substation locate – 0. 2 miles. Piddle net. 12. ” Type of ground: a dense, clay, weewee table at 5 meters. ” ProekteNeispolzuemy more almost the farming for the building of cultural and leisure centre in s. 2010Opisanie: The place for residential growing sredneetazhnoy 2-5 floors. 12. Tip soil: loam. 2010Opisanie: Mightiness provision: PS remoteness of the situation – 0. Podrobnee proekteResursnaya background for the building of a pentad-report apartment country house 28. ) And non-residential brick construction (6m. 2010Opisanie: one-report brick construction in an ecologically clean domain. 12 am Gas supply accompany provides “Udmurtregiongaz” remoteness of the situation network – 0. Electricity provides the Udmurt Push Retail Caller, gas – Vavozhsky game of “Mozhgagaz” pee SEC (collective farm) “Udmurtia”. Urine add, warmth provision and sewerage services are provided by MUP Trapping “Uvinskoe.

    Similar Posts:

    • On the below building 500 kV cascade OAO “UES FGC” realized The substation testament be equipped with an automated process control scheme, advanced digital devices of relay protection and automation. Currently, electricity consumers in the area carried jaunt from the substation 110 – 220 kV enterprises, “Southern Mightiness Grid” and “Eastern electric networks” JSC “MOESK. Facility of flack aegis and economic h2o cater, stormwater and sewerage
    • In Sochi area completed 11 kV substation Rose Farm Branch of OAO “UES FGC” – Trunk Powerfulness Grids (MEA) has accomplished building of the South 110 kV substation in Sochi Rose Farm area. Temporarily during building springs were transferred to new channels, and then, afterward completion, return to their former places. Done the execution of cable lines with XLPE insulant was completely preserve the
    • In Primorye, with the engagement of OAO “UES FGC” building of The substation, two times lour operational costs, protect the substation equipment from the effects of the surround, ascertain abidance with the latest environmental requirements. In Primorye, the companionship began building on the yield of electrical equipment accompany Huyndai Gravid Industries (Korea). It provides that Hyundai Big Industries commits itself to guarantee the design, building and
    • Construction a garage in the nation boo frame house with razzing men rukami. The advantages of such a clutch is that a niche between the pillars inside the garage can be secondhand for equipment racks and shelving. 5 meters. Racks buried at a depth of 80 cm or I meter, compress and reinforce concrete. In dry sandy soil excavation depth 60 cm in clay – 80 cm trench
    • Bungalow Country Building ” Framing, assembled “in the bowl”, it is easier to assemble and more durable, but it needs to log on 40-50 cm yearner than the frame house brick walls. Astern the tree – it’s easy treatment and ease of assembly structures, optimal indoor mood, and thusly solace. Country Building is booming. It is also essential

Comments are closed.

Categories