• In Primorye, with the engagement of OAO “UES FGC” building of

    Jun 16

    The substation, two times lour operational costs, protect the substation equipment from the effects of the surround, ascertain abidance with the latest environmental requirements. In Primorye, the companionship began building on the yield of electrical equipment accompany Huyndai Gravid Industries (Korea). It provides that Hyundai Big Industries commits itself to guarantee the design, building and subsequent process of the engraft in Primorye Artem. For 5 years lustre envisages the building of 23 substations and 6 grand kilometers of superpower lines. At present, Russia is not commercially available GIS 220-500 kV, in connector with which the equipment is purchased from foreign manufacturers. Pursuant to the bespeak of the Governing of the Russian Confederation OAO “UES FGC” has been conducted and the study that resulted in the signing in November 2010 correspondence betwixt the Federal Meshwork Accompany and Huyndai Heavy Industries with the involvement of Primorsky Territory Administration to chassis a embed in the area of electrical equipment with the localization of production in the Russian Confederation.

    Similar Posts:

    • On the below building 500 kV cascade OAO “UES FGC” realized The substation testament be equipped with an automated process control scheme, advanced digital devices of relay protection and automation. Currently, electricity consumers in the area carried jaunt from the substation 110 – 220 kV enterprises, “Southern Mightiness Grid” and “Eastern electric networks” JSC “MOESK. Facility of flack aegis and economic h2o cater, stormwater and sewerage
    • The situation for the building of the XXI 100 ecovillage 5 miles. 2010Opisanie: Power ply: PS remoteness of the locate – 0. 45 km. Electricity provides the society “Uvinskie zone galvanic networks” JSC “Udmurtenergo” PS remoteness of the website – 1 km. Elektrosnabzhenie provides Sarapul branch OAO “Udmurt Vim Retail Company”, the distance from the substation situation – 0. 2010Opisanie: Country country for the building
    • In Sochi area completed 11 kV substation Rose Farm Branch of OAO “UES FGC” – Trunk Powerfulness Grids (MEA) has accomplished building of the South 110 kV substation in Sochi Rose Farm area. Temporarily during building springs were transferred to new channels, and then, afterward completion, return to their former places. Done the execution of cable lines with XLPE insulant was completely preserve the
    • Gamey-rise construction Widely usable disassembled and transportability, small-and Prominent-timbering, formwork, ie, consisting of modular panels, logs with a arrangement of additional elements. In the manufacture of prefabricated constructions laid tolerances at all stages of the process that lead to extra metre spent in coating the joints. Our country does not exist yet versatile formwork organisation, so the
    • Building of transshipment hub for the delivery of new equipment In the arcsecond one-half of June to get sword hard-on and equipment of kid. Payload node volition reach 190 tons. Reloading the node leave be licensed in summertime 2011. So, through the White Sea-Baltic Canal, will be released in the White Sea, and further along the Northern Sea Road, p. At the moment, finished concreting

Comments are closed.

Categories

 

Error. Page cannot be displayed. Please contact your service provider for more details. (27)